Russell corridor drilling starts Monday

Drilling crews will begin testing work at several locations along Russell Street and Broadway on Monday.
The project will take infiltration core samples to determine soil drainage characteristics under the streets for future construction. Most drilling will be outside travel lanes, but some spots will require 5-10-minute traffic delays. Drilling work will take place between 7:30 a.m. and 5:30 p.m.
A California national park has been used as a testing ground for NASA missions for decades.
The work occurs on Russell Street between Dakota Street and Mount Avenue, and on West Broadway between Toole Avenue and Mullan Road. The project should be completed by the end of March, weather permitting. Alternative commuting routes are recommended.
The Russell Corridor project includes new boulevards, added bike lanes, crosswalks and sidewalks. This will take place over the next three to five years.
0 Comments You must be logged in to react.
Click any reaction to login. #lee-rev-content { margin:0 -5px; } #lee-rev-content h3 { font-family: inherit!important; font-weight: 700!important; border-left: 8px solid var(–lee-blox-link-color); text-indent: 7px; font-size: 24px!important; line-height: 24px; } #lee-rev-content .rc-provider { font-family: inherit!important; } #lee-rev-content h4 { line-height: 24px!important; font-family: “serif-ds”,Times,”Times New