Mullan BUILD detour at England Boulevard and Flynn Lane starts Sept. 19

There will be a road closure at the intersection of England Boulevard and Flynn Lane beginning Monday, Sept. 19 and lasting 3-5 days. This closure is a part of the Mullan BUILD construction. 

Water main work is to be completed during this closure. Detour signs and temporary stop controls will be present at intersections along Mary Jane Boulevard and Fleet Street to direct traffic around the intersection closure. 

Please use cation while driving near this area. 

0 Comments You must be logged in to react.
Click any reaction to login. #lee-rev-content { margin:0 -5px; } #lee-rev-content h3 { font-family: inherit!important; font-weight: 700!important; border-left: 8px solid var(–lee-blox-link-color); text-indent: 7px; font-size: 24px!important; line-height: 24px; } #lee-rev-content .rc-provider { font-family: inherit!important; } #lee-rev-content h4 { line-height: 24px!important; font-family: “serif-ds”,Times,”Times New Roman”,serif!important; margin-top: 10px!important; } @media (max-width: 991px) { #lee-rev-content h3 { font-size: 18px!important; line-height: 18px; } } #pu-email-form-daily-email-article { clear: both; background-color: #fff; color: #222; background-position: bottom; background-repeat: no-repeat; padding: 15px 0 20px; margin-bottom: 40px; border-top: 4px solid rgba(0,0,0,.8); border-bottom: 1px solid rgba(0,0,0,.2); display: none; } #pu-email-form-daily-email-article, #pu-email-form-daily-email-article p { font-family: -apple-system, BlinkMacSystemFont, “Segoe UI”, Helvetica, Arial, sans-serif, “Apple Color Emoji”, “Segoe

View Source