Line 3 opposition tours Mississippi Headwaters amid drought

The pipeline is edging closer to the Mississippi River as drought rampages across the state, leaving waterbeds shallow and dry, and ominous smoke hangs in the air from Candian wildfires. Recent weeks have seen an uptick in protests, with controversy centering on how much water is permitted for the construction of the tar sands pipeline.

Representatives from Enbridge said the 330-mile replacement project is 70% complete, but despite this, “water protectors” remain steadfast in their opposition. Line 3, in its entirety, stretches 1,097 miles from the tar sands of Edmonton, Alta., to Superior, Wis.

On Tuesday, July 20, organizations gathered press and politicians at the Headwaters of the Mississippi River in Itasca State Park to demonstrate the impacts of Line 3 to states downstream on the Mississippi River, and speak about treaty rights.

Organizers included the Rights of Mississippi River, the RISE Coalition, Science for the People-Twin Cities, Vote Climate, MN350 and Health Professionals for a Healthy Climate.

listen live

watch live

The event was titled “10 States Sharing One Misi-ziibi: Dewatering, Deforestation, and Destruction at Headwaters” and organizers had set

View Source